"We're here now, nearing the end. Everything's coming together really nice," city engineer Steven Berens told WGCU in late August, as the Army Corps of Engineers finished pumping new sand onto Venice's beaches. Three months later, the work is mostly done. The City of Venice's November 12 update lists one remaining task: rock remediation in the central part of the project area. The contractor is waiting for a specialized piece of equipment to arrive before it can finish, and part of the parking lot near the Venice Fishing Pier is still closed.
If guests are in town this week and someone wants a morning on the Gulf, start with that last detail. The pier is the most dependable thing on the south end of Venice's shoreline right now. It is rebuilt, open around the clock and free. The beach around it and the beach south of it are still being finished, and the plan for the day should account for that.
The Pier Is The Finished Piece
Two years ago the pier was the problem. WWSB reported it closed after Hurricane Helene while the city assessed the damage, in early October 2024. On November 21, 2024, the city reopened it partway, out to the second fish-cleaning station, behind a temporary fence. The T-end stayed closed for bigger repairs. The Venice Gondolier reported that the T-section's framing, decking and railing were damaged, and that Hurricane Milton's waves came over its protective railing.
According to the Venice Gondolier, Tampa Bay Marine Inc. replaced the damaged framing, decking and railing for $410,000 and kept the original primary beams, pile caps and piles. The rest of the pier and the bait shop stayed open during construction. The City's pier page dates the repair to August and September 2025, and WWSB reported that the pier fully reopened on September 29, 2025.
So this is the pier's second full holiday season since the repair. The City's fishing pier page lists it as open 24 hours a day and free to walk out on. Papa's Bait Shop is listed as open daily from 8 a.m. to 8 p.m., weather permitting. Sharky's on the Pier says on its own site that Papa's sells bait and rents rods and reels, so a visiting relative can fish without packing gear. Sharky's on the Pier and Fins at Sharky's are both at the foot of the pier. If you plan a meal around the walk, check hours on their own sites.
The Sand Under The Pier Arrived In August
The beach on both sides of the pier is new this year. The Venice Shore Protection Project 2026 renourished about 3.2 miles of shoreline, from south of Venice Inlet to south of the Venice Fishing Pier. The Army Corps of Engineers managed it, Weeks Marine, Inc. built it, and the construction contract was $27,495,000, all of it federally funded. It replaced sand the beach had lost since the previous renourishment in 2015.
The sand is from Englewood. According to WGCU, the project was delayed a year because the Army Corps could not find smooth, quartz-based sand in the white color that matched what was left on Venice's beach. It found the right sand offshore of Englewood Beach. Dredging started June 21, 2026. When sand placement ended on August 16, Weeks Marine reported nearly 620,000 cubic yards on the beach. Because the work ran through turtle season, Mote Marine Laboratory moved more than 500 sea turtle nests out of the way. Berens told WGCU that was far more than Mote expected.
That sand may be the last from that spot. The City's state legislative priorities say the borrow area used this year is now depleted. The Army Corps plans to start searching for a new one in 2027, a search the city expects to cost about $1,000,000 from the Corps and $500,000 from the City.
The Pier Lot Has Been A Construction Site Since May
The pier parking lot is partly closed because it was the project's base. Equipment started arriving at the main staging area near the Venice Fishing Pier on May 14. The City's plan closed part of the lot and the beach access paths north and south of the pier for staging throughout construction.
The remaining work is near the pier too. Rock remediation began August 25 south of the pier. In the September 30 update, Weeks Marine expected to finish the rock work and sand tilling throughout the project area by late October. The November 12 update narrows what's left to the central part of the project area and still lists part of the pier lot as closed. The stormwater outfall extensions are finished. That work ran from the outfall about 400 feet south of the Venice Beach Pavilion to the ones at Aldea Mar, Golden Beach and the Coast Guard station.
In practice, a pier visit this week means fewer spaces at the lot that used to be easiest to park in, and possibly some equipment at work on the beach. Brohard Paw Park's beach access was closed for long stretches this summer while work went on nearby, most recently for one day of sand tilling on October 7. The City's renourishment project page posts each update as it happens. It is worth a look before you load the car.
Caspersen Is A One-Mile Walk From South Brohard
South of the pier, getting to the beach takes more effort. Sarasota County's Caspersen Beach Park page says the Harbor Drive access washed out during the 2024 storm season. Restrooms, vehicle parking and the playground are closed until repairs are made. The park is open to people on foot and on bikes, from South Brohard Park or from the Venetian Waterway Park Trail at the City of Venice Festival Grounds, and its hours are 6 a.m. to 10 p.m.
Last week Spectrum News talked with beachgoers who park at South Brohard Park and walk about a mile to Caspersen, through deep sand on a route that has never been paved. They said finding a parking spot at South Brohard can be a fight of its own. The station called Caspersen what Venice residents call it, the Shark Tooth Capital of the world, and the shark teeth are why people still make the walk. In an earlier report on the road, the Venice Gondolier quoted Linda Hervas, owner of Shark Frenzy and Fossil Frenzy, saying the smaller crowds hadn't hurt her businesses and sand sifters were still her best seller.
For a mixed group, the walk sets the plan. Anyone who wants a short stroll, a bench and a view can stay on the pier. The ones carrying a sifter can head south from South Brohard with water, because the park has no restrooms or showers at the end of the walk.
The Road Back May Run Through The Airport
The road question is open, and its next step moved this fall. Venice City Manager James Clinch told Spectrum News that the closure has caused major parking and ADA accessibility problems. "We used to have 250 parking spaces and restrooms available there for some great public beach access," he said.
The City has added "Restoring Access to Caspersen Beach" to its state legislative priorities. That page says rebuilding the road where it was before the storms is not feasible because of shoreline impacts from the hurricanes. The City's proposal is a new, more resilient road from Harbor Drive South through Venice Airport property. The City also points out that the county owns and operates the park, which sits directly next to city jurisdiction. Clinch brought up the airport route at a City Council meeting this month as a possible project with the county. In that same Venice Gondolier report, Nicole Rissler, the county's Parks, Recreation and Natural Resources director, said the road would be a "multiyear" project. Options under discussion then included a route around Red Lake, a long bridge, or no vehicle access at all. The same City priorities page lists Humphris Park on the South Jetty, at the north end of the renourished beach, among the beach access the storms took away.
Building A Guest Day Around The Pier
For this weekend, the pier is the one sure stop. Arrive early, plan on the lot being smaller than you remember, and walk the full length out to the rebuilt T-end. That deck is about a year old, and the sand below it was placed this August. Let anyone who wants teeth go south from South Brohard, and meet back at Sharky's or Fins.
The evening can move downtown. The 50th Annual Venice Holiday Parade, "Golden Traditions," steps off at 6:30 p.m. on Saturday, November 28, with pre-parade activities starting as early as 2 p.m. The City has posted the route map and road closures on its Venice Holiday Parade page. Our Venice neighborhood page and our guide to beaches, biking and everyday routines in Venice cover the rest of the routine once the guests head home.
If you own near Venice's beaches and want to show buyers what this shoreline looks like now, with the new sand, the rebuilt pier and the walk-in route to Caspersen, My Digital Listing can film it into your listing video and virtual tour so out-of-state buyers see it before they visit. Get your free digital listing plan.